Calendar An icon of a desk calendar. Cancel An icon of a circle with a diagonal line across. Caret An icon of a block arrow pointing to the right. Email An icon of a paper envelope. Facebook An icon of the Facebook "f" mark. Google An icon of the Google "G" mark. Linked In An icon of the Linked In "in" mark. Logout An icon representing logout. Profile An icon that resembles human head and shoulders. Telephone An icon of a traditional telephone receiver. Tick An icon of a tick mark. Is Public An icon of a human eye and eyelashes. Is Not Public An icon of a human eye and eyelashes with a diagonal line through it. Pause Icon A two-lined pause icon for stopping interactions. Quote Mark A opening quote mark. Quote Mark A closing quote mark. Arrow An icon of an arrow. Folder An icon of a paper folder. Breaking An icon of an exclamation mark on a circular background. Camera An icon of a digital camera. Caret An icon of a caret arrow. Clock An icon of a clock face. Close An icon of the an X shape. Close Icon An icon used to represent where to interact to collapse or dismiss a component Comment An icon of a speech bubble. Comments An icon of a speech bubble, denoting user comments. Comments An icon of a speech bubble, denoting user comments. Ellipsis An icon of 3 horizontal dots. Envelope An icon of a paper envelope. Facebook An icon of a facebook f logo. Camera An icon of a digital camera. Home An icon of a house. Instagram An icon of the Instagram logo. LinkedIn An icon of the LinkedIn logo. Magnifying Glass An icon of a magnifying glass. Search Icon A magnifying glass icon that is used to represent the function of searching. Menu An icon of 3 horizontal lines. Hamburger Menu Icon An icon used to represent a collapsed menu. Next An icon of an arrow pointing to the right. Notice An explanation mark centred inside a circle. Previous An icon of an arrow pointing to the left. Rating An icon of a star. Tag An icon of a tag. Twitter An icon of the Twitter logo. Video Camera An icon of a video camera shape. Speech Bubble Icon A icon displaying a speech bubble WhatsApp An icon of the WhatsApp logo. Information An icon of an information logo. Plus A mathematical 'plus' symbol. Duration An icon indicating Time. Success Tick An icon of a green tick. Success Tick Timeout An icon of a greyed out success tick. Loading Spinner An icon of a loading spinner. Facebook Messenger An icon of the facebook messenger app logo. Facebook An icon of a facebook f logo. Facebook Messenger An icon of the Twitter app logo. LinkedIn An icon of the LinkedIn logo. WhatsApp Messenger An icon of the Whatsapp messenger app logo. Email An icon of an mail envelope. Copy link A decentered black square over a white square.

Proposals submitted to upgrade three north-east railway bridges

One of the railway bridges near Canal Place, Port Elphinstone.
One of the railway bridges near Canal Place, Port Elphinstone.

Work could soon be underway to upgrade railway bridges as part of a multi-million-pound scheme to cut journey times between the north-east and Highlands.

Network Rail has applied for permission to strengthen and widen the Don Viaduct and Canal Road bridges in Port Elphinstone and another similar structure at Bridge Ale House, Kintore.

The bridges – which vary in age and the materials they were built with – need to be upgraded to accommodate increased loads and additional rail track.

But before this work can begin the firm needs permission from planners to proceed, with a view to starting the work next month.

The iron Don Viaduct historically had two tracks but one has since been removed and now needs to be replaced, along with strengthening and repairs to the steelwork on the structure.

The steel tructure on Canal Road will be completely replaced on top of the existing girders, and the Kintore bridge will be widened.

A total of £300million has been invested in dualling the track between Aberdeen and Inverness, increasing the number of services.

The line between Aberdeen and Dyce was twin-tracked over 14 weeks this summer.
Improvements have already been completed between Elgin and the north.

The final phase of the work, which will dual the rest of the route, is scheduled to last from May to August.

A spokesman for Network Rail said: “The work we are planning to carry out at these structures is a vital part of the overall Aberdeen-Inverness Improvement Project.

“Doubling the track between the city and Inverurie will improve reliability and increase services for passengers.

Last month Network Rail unveiled a £9million programme of “vital” track and level crossing enhancements between Aberdeen and Dundee over six weekends this month and next.

Engineers will renew 8,202ft of track between the two cities and upgrade the Carnoustie level crossing.

During the work, more than 8,000 tonnes of old material will be removed and 3,500 new concrete sleepers.

The new timetable, with increased services, will go live in December.