Calendar An icon of a desk calendar. Cancel An icon of a circle with a diagonal line across. Caret An icon of a block arrow pointing to the right. Email An icon of a paper envelope. Facebook An icon of the Facebook "f" mark. Google An icon of the Google "G" mark. Linked In An icon of the Linked In "in" mark. Logout An icon representing logout. Profile An icon that resembles human head and shoulders. Telephone An icon of a traditional telephone receiver. Tick An icon of a tick mark. Is Public An icon of a human eye and eyelashes. Is Not Public An icon of a human eye and eyelashes with a diagonal line through it. Pause Icon A two-lined pause icon for stopping interactions. Quote Mark A opening quote mark. Quote Mark A closing quote mark. Arrow An icon of an arrow. Folder An icon of a paper folder. Breaking An icon of an exclamation mark on a circular background. Camera An icon of a digital camera. Caret An icon of a caret arrow. Clock An icon of a clock face. Close An icon of the an X shape. Close Icon An icon used to represent where to interact to collapse or dismiss a component Comment An icon of a speech bubble. Comments An icon of a speech bubble, denoting user comments. Comments An icon of a speech bubble, denoting user comments. Ellipsis An icon of 3 horizontal dots. Envelope An icon of a paper envelope. Facebook An icon of a facebook f logo. Camera An icon of a digital camera. Home An icon of a house. Instagram An icon of the Instagram logo. LinkedIn An icon of the LinkedIn logo. Magnifying Glass An icon of a magnifying glass. Search Icon A magnifying glass icon that is used to represent the function of searching. Menu An icon of 3 horizontal lines. Hamburger Menu Icon An icon used to represent a collapsed menu. Next An icon of an arrow pointing to the right. Notice An explanation mark centred inside a circle. Previous An icon of an arrow pointing to the left. Rating An icon of a star. Tag An icon of a tag. Twitter An icon of the Twitter logo. Video Camera An icon of a video camera shape. Speech Bubble Icon A icon displaying a speech bubble WhatsApp An icon of the WhatsApp logo. Information An icon of an information logo. Plus A mathematical 'plus' symbol. Duration An icon indicating Time. Success Tick An icon of a green tick. Success Tick Timeout An icon of a greyed out success tick. Loading Spinner An icon of a loading spinner. Facebook Messenger An icon of the facebook messenger app logo. Facebook An icon of a facebook f logo. Facebook Messenger An icon of the Twitter app logo. LinkedIn An icon of the LinkedIn logo. WhatsApp Messenger An icon of the Whatsapp messenger app logo. Email An icon of an mail envelope. Copy link A decentered black square over a white square.

Calls to end to Government’s ‘feast or famine’ treatment of north-east roads

South Deeside Road, in Aberdeenshire
South Deeside Road, in Aberdeenshire

Aberdeenshire’s road network has reached “crisis point” with a new document revealing a crippling backlog of repairs totalling £99 million pounds.

It has been claimed the backlog is “growing bigger by the day” and hampering businesses and livelihoods across the north-east.

The revelations emerged in an Aberdeenshire Council report exploring the authority’s road network in terms of size, value and condition – while also presenting investment scenarios to consider for the future.

The report was the first of its kind after the authority last year agreed to fully investigate its deteriorating road network annually.

Increased flooding over the years has affected the road budget<br />(Portsoy in 2017)

The total length of public road maintained by the council stands at 3,456 miles and has grown by 20.6 miles over the last year, with new infrastructure created in connection with the AWPR.

The report explains that the “gross replacement cost” of council carriageways has been calculated as £4.387 billion.

It adds: “There is a considerable length of the network that requires further work to bring it back into a good condition.

“The latest estimate of this maintenance backlog was in excess of £99m.”

Roads in the north-east have already suffered due to unprecedented flooding and the authority has been warned there isa lack of funds to protect them against even a “relatively mild winter”.

The report also revealed that the council has forked out £78.4m over the last seven years on planned road maintenance.

Previously, north-east MSP Mike Rumbles accused the SNP of “papering over cracks” on roads across Scotland, as the cost of protecting the vital links between communities rose nationwide.

And last night, fellow North East MSP Peter Chapman also placed the blame in the hands of Nicola Sturgeon’s government.

He said: “Aberdeenshire has had its core budget cut by the SNP for eight years in a row.

“To maintain more than 3,500 miles of roads and streets, there simply isn’t enough money from Holyrood.

“And you need well-maintained roads to do business and to raise money.”

Cash-strapped Aberdeenshire Council would struggle to cope with even a mild winter

Meanwhile Neil Greig, of road safety charity IAM RoadSmart, said action needed to be taken to avoid a ‘”feast or famine” approach to tackling road defects.

He said: “Aberdeenshire Council’s own figures graphically show the scale of the problem they face – which is also partly of their own making.

“By under-spending on roads they have simply stored up trouble for the future and made it even more difficult to attack the huge backlog that just gets bigger every day.

Aberdeenshire potholes getting repaired last year

“IAM RoadSmart support long-term guarantees of funding for local councils to help them plan to eliminate their maintenance backlogs.

“The resources to do this can easily be found from the millions of pounds in taxes paid by Scottish drivers on fuel on road tax.

“With long term guarantees in place we can move away from the inefficient ‘feast or famine’ approach to road defects, such as potholes, that have blighted the north-east’s roads for decades.”

Millions forked out to fix ‘huge backlog’ of potholes in north-east and Highlands

Across Aberdeenshire, the budget to cover carriageways, footways, street lighting, bridges, structures and traffic signals is to rise dramatically.

The cost to replace the entire road network is estimated to be £4 billion.

In comparison, the total value of Aberdeenshire Council’s other physical assets – such as property and heritage buildings – comes to £1.6m.

The cost of maintain the vast road network currently stands at £14,888,000, but that is poised to rise to £25m for 2020/21.

Mr Chapman added: “As we have seen in recent spells of bad weather, our roads and bridges can be a massive drain on the public purse.

“The SNP has cut our local government funding to the level where adequate spending isn’t possible.”

Meanwhile a spokesman for finance secretary Derek Mackay claimed the government had been “delivering” for the north-east’s road network, while battling with their own financial struggles.

Finance Secretary Derek Mackay

He said:  “The Tories should apologise to the people of the north-east for a decade of austerity and for the ongoing shambles of Brexit which threatens so many jobs in the area and across the country.

“The reality is that it is the SNP Government has been delivering for the north-east – despite having our own budget cut by the Tories at Westminster.

“We have funded major projects like the £745m AWPR, which the Tories failed to take forward.

“We are also spending £125m as part of the Aberdeen City Region Deal, plus an additional £254m for key infrastructure.”